Product Cost by Period in SAP S/4 Hana Controlling
Learn SAP S/4HANA Controlling: Product Costing by Period. Master accurate cost calculations and analysis.
Course Content
Product Cost by Period in SAP S/4 Hana Controlling is an intermediate-level Udemy course taught by Muhammad Hassan Askari. It runs 59m, is taught in English, and includes a certificate of completion. Learners rate it 3.0 out of 5 from 2 reviews, with 129 students enrolled. It is a paid course, first published July 2023.
The Product Cost Collector is a valuable tool within Cost Object Controlling, specifically designed for repetitive manufacturing scenarios. This method is highly recommended when producing the same product consistently over an extended period, with minimal changes to its Bill of Materials (BOM), recipe, or routing. It's ideal for businesses engaged in mass production or make-to-stock operations, enabling efficient production management and leveraging economies of scale.
In industries like FMCG where sales are often forecasted periodically and demand is predictable, the Product Cost by Period method offers a streamlined approach to product costing. Production is scheduled and executed based on these forecasted periodic demands, making this method particularly useful.
The process begins with Plan Activity Price calculation. This establishes activity costs that are subsequently posted to Production Orders or the Product Cost Collector (in planned orders) during confirmation, using a formula: (Actual Quantity * Plan Price KSPI).
Key master data preparation for manufacturing Finished Goods (FG3) includes:
- BOM (Bill of Material for FG3): Defines the components required for the product.
- Work Centers: (e.g., 3001-3003) Represent the locations where production activities take place.
- Rate Routing: Essential for repetitive manufacturing. It defines the sequence of operations and associated costs. Control keys within the Rate Routing specify milestones or operations where confirmation occurs, acting as reporting points.
- Execute Planned Cost Estimate: This step involves assigning the RM3 (Raw Material 3) to Operation 010 (the first reporting point) in the routing. This ensures that when the operation is confirmed, the RM3 quantity is automatically suggested and posted.
Raw material issuance to the Product Cost Collector can be achieved through three methods:
- Manual Goods Issue: Using transaction MB1A to manually issue goods to the order.
- Back Flushing: Requires specific settings in the MRP2 view of the material master and potentially in the work center master data.
- Automatic Issuance through Routing Operation Confirmation: Components are assigned to operations within the BOM master data.
Finally, a Production Version is created, which combines the BOM and Routing. A separate Product Cost Collector is created for each Production Version, assigned within the MRP4 view of the FG Material Master. This allows for accurate and distinct cost tracking for different product variations.
Need a SaaS MVP shipped fast? Hire the TutorialSearch.io team
Auth, billing, dashboards and AI features — a launch-ready product built by the devs behind this site.