HVAC​ Commissioning 2 - FAT / SAT

HVAC control system testing: Learn what to test during FAT & SAT. Ensure optimal performance & reliability.

4.4(20)
124students
1h 51m
Certificate
훈상 (Hoon-Sang) 윤 (Yun)
훈상 (Hoon-Sang) 윤 (Yun)HVAC, Automation, Firefighting & Commissioning Engineer

Course Content

HVAC​ Commissioning 2 - FAT / SAT is a beginner-level Udemy course taught by 훈상 (Hoon-Sang) 윤 (Yun). It runs 1h 51m, is taught in English, and includes a certificate of completion. Learners rate it 4.4 out of 5 from 20 reviews, with 124 students enrolled. It is a paid course, first published January 2021.

Commissioning in HVAC Projects: A Practical Guide

Commissioning is a critical phase of any project, and understanding its nuances is key to success. It’s not a one-size-fits-all process; commissioning procedures are highly dependent on specific project requirements and end-user standards. My experience working on EPC projects across the Middle East highlights this. For instance, the performance testing of HVAC systems was a standard procedure in Qatar, but not always necessary in the UAE.

Many mechanical engineering graduates find automatic control systems challenging. A control panel (CP) is a complex assembly, requiring meticulous checks during Factory Acceptance Testing (FAT) and Site Acceptance Testing (SAT). This complexity is precisely why I created this course – to demystify FAT and SAT processes for HVAC industrial projects.

This course provides a practical, hands-on approach to understanding FAT and SAT procedures. I've incorporated numerous activities to cover a wide range of scenarios, allowing you to adapt the information to your specific needs. Whether you’re new to commissioning or looking to refine your skills, this course will equip you with the knowledge you need.

Here's a breakdown of the topics we'll cover:

  • Introduction: Understanding the fundamentals of HVAC commissioning.
  • AHU, ACCU & CP Appearance: A detailed look at the physical components.
  • CP Painting: Best practices for control panel finishing.
  • CP Configuration: Understanding and implementing control system settings.
  • CP Power Cable: Proper installation and safety considerations.
  • CP Power On: Safe and effective power-up procedures.
  • I/O Point Check: Verifying the functionality of input/output points.
  • Function Test: Testing individual components and system functions.
  • SAT: Comprehensive Site Acceptance Testing procedures.

Based on my experience working on four EPC projects in the Middle East, this course offers real-world insights into the commissioning process. Gain valuable ideas about the activities involved in FAT and SAT and improve your understanding of HVAC systems. Good luck!